How Do I Use Work Planner in Operations Center?
Steps to Use Work Planner
- Access Work Planner: Go to the "Plan" section in the Operations Center and select "Work Planner."
- Select the Type of Work: Choose the type of work, such as "Seeding."
- Set Up the Work Plan: Click "Plan Seeding," select the field(s), and click "Next."
- Define Crop Information: Set the crop variety and target seeding rate. Load a saved prescription if available.
- Include Guidance Tracks: Add active guidance tracks. The starred track will be selected first.
- Choose Machine and Implement: Optionally, select the machine and implement for the work.
- Assign an Operator: Assign an operator for tracking and accountability.
- Add Work Order Number and Instructions: Set a work order number and include specific instructions.
- Save the Work Plan: Click "Save" to finalize the work plan.
- Send the Work Plan to Equipment: After saving, send the work plan to the equipment.
- Operator Review: Upon arrival, the operator will be prompted about the work plan. They can review and confirm it, with all relevant information pre-filled.
By following these steps, you can use the Work Planner feature to streamline operations and boost field efficiency. For more guides, visit the Koenig Support section on our website!